Flexco’s Enclosed Skirting System Saves 300 Hours of Annual Lost Production at a Cement Plant

Flexco Dual Seal Polyurethane Skirting

Industry

Cement Plant

Application

Clinker & Limestone

Product

Enclosed Skirting System

Objective

Improve worker safety by reducing dust exposure and spillage on walkways

Conveyor Details

800mm wide, 1.5m/sec, 35°degree trough

Problem:

Mining and processing minerals operations can generate large amounts of dust as it is processed into a marketable commodity, potentially exposing workers to elevated levels of airborne dust. In particular, cement plants are notoriously known for producing high levels of dust due to the fine nature of the conveyed material. Inhalation of cement dust is a paramount issue for operations as it leads to a variety of respiratory and cardiovascular health issues. One of Australia’s largest producers of clinker and limestone was experiencing excess dust at their transfer chute. When the conveyed material hits the belt from the transfer chute, it causes the dust to rebound off the belt and into the atmosphere, generating significant quantities of respirable dust and spillage in the walkways that put their staff’s safety at risk when conducting tasks at the conveyor and surrounding area.The site was currently using a rubber curtain at the end of the transfer chute, but it was unable to sufficiently contain or suppress the airborne dust. As a result, to minimise safety hazards, the site was left with no choice but to barricade the area and impose no entry while in operation.

Solution:

The cement plant called an authorised Flexco distributor to assess the area and recommend suitable solutions for dust and spillage containment.The distributor and their FlexcoTerritory Manager assessed the area and proposed a 2.4-metre-long enclosed skirting system custom-engineered to fit the existing chute and the 800mm wide conveyor belt.The enclosed skirting system included custom wear liners to provide increased skirt liner life, dust curtains to control the airflow and keep dust levels low, and Flexco’s proprietary polyurethane skirting offering 3-4 times more wear life than rubber skirting.

Result:

The site saw an immediate reduction in dust and spillage in the walkways once the enclosed skirting system was installed. Nearly all the airborne dust has been eliminated to the extent that the area has been deemed safe for workers to enter without a dusk mask while in operation. Additionally, minimal maintenance and cleaning duties are required. Previously, the site spent $5,000 per month on external contractors and a vacuum truck to clean the area.This process would not only cost the site time, labour resources and money, but it would halt production for 25 hours per month.This meant the site was losing $60,000 on external maintenance costs and 300 hours of lost production per year. Flexco’s custom enclosed skirting system has eliminated these costs for the operation, with no maintenance or clean-up required since it has been installed 3 months ago. With the substantial improvements in safety, maintenance requirements, and dust containment, the cement plant plans to install an additional custom-enclosed skirting system for another conveyor.